5 Downpipe Installers in Wheelers Hill

Receive no-obligation quotes from reviewed, rated & trusted Downpipe Installers in minutes.

I need
In
  • Powered by Google
available now
available now

Best rated Downpipe Installers in Wheelers Hill

Darren C

Darren C

Keilor Park VIC

(81)

Latest Review

"Helpful and showed up on time "

Verified Badges

Mobile

Mobile Verified

Facebook

Facebook Verified

Callum F

Callum F

Lilydale VIC

(4)

Latest Review

"Mark was excellent and was very professional and friendly guy. Thank you Callum and Mark"

Verified Badges

Mobile

Mobile Verified

Now Available!
  • Get it done now. Pay later.
  • Repay in 4 fortnightly instalments
  • No interest
  • Available on payments up to $1,500

What is Airtasker?

1

Post your task

Post your task

Tell us what you need, it's FREE to post.

2

Review offers

Review offers

Get offers from trusted Taskers and view profiles.

3

Get it done

Get it done

Choose the right person for your task and get it done.

Now Available!
  • Get it done now. Pay later.
  • Repay in 4 fortnightly instalments
  • No interest
  • Available on payments up to $1,500
From Gutter Repair, Roof Repair, and Gutter Cleaning; you can get all types of Downpipe Installation & Repair done usually between $220-$640, with the median price of Downpipe Installation & Repair in Wheelers Hill being $430.
Don't live in Wheelers Hill? We also have Downpipe Installers available in North West Melbourne and South East Melbourne available today.

Recent Downpipe Installation & Repair tasks in Wheelers Hill

Downpipe installation

$10

Wheelers Hill VIC, Australia

21st Jul 2021

Schedule 1: Rerouting and install new downpipe, over-ground stormwater pipes and connecting T-junction pipes for underground stormwater pipes DETAILS of approximate scopes of the project (Any better idea is acceptable; DRAWING AND photos added) The job needs to be done in six tasks in an urgent basis as the water issue cause damages to foundation. See slide 2 for the overall plan around the house. The job is not challenging needs routing with PVC pipes and installation of a new downpipe. : Task 1: Rerouting existing downpipe and add new downpipe, join then with a Tee and draw PCV (90mm) pipe to the far end downpipe with a Tee (Slides 3,4) Task 2: Seal (plugged off) backside downpipe and connect with the nearby gutter of he shade. (Slides 5,6) Task 3: Seal (plugged off) shade through downpipe and connect an elbow to join with the gutter of the shade. (Slides 7, 8) Task 4: connect the new downpipe with an over ground PVC 90 mm pipe to Deck corner of stormwater pipe with a Tee (Slides 9,10,11) Task 5: Fill opening of the ducted hear base with polythene and low permeable filler (Slide 12) Task 6: Seal the edge of the concrete and the wall with silicon or levelling grout (Slide 13) Detailed scope are given in the drawings and photos. Remarks: Please go through the scope of the works carefully (Tasks 1-6), state the commencement date and quote the job. Duration: Job duration from start to complete three days to one week.

Callaum is a timely person.

Install new downpipe and raise connecting pipes

$1,800

Wheelers Hill VIC, Australia

3rd Jun 2021

The job needs to be done in an urgent basis as the water issue cause damages to foundation. Job includes: 1. Approximate scope of the work is given in the Scope drawing. Any better idea is welcome. 2. Check with camera for any blockage and misalignment of the downpipe and drains for leakage of water all points and stormwater drains for the house. 3. Raise the connecting pipes from underground stormwater pipe to the concrete surface level (5 places). Concrete near downpipe cutting is required. 3. Install a new downpipe with the underground stormwater pipe. (one existing down pipe and another new downpipe as shown above. 4. If the existing stormwater pipe is blocked pressure jet to unblock or repair. 5. Deviation of downpipe for the shade. Bigger stormwater pipe may be required.

CCTV Inspection of downpipes, joints and subfloor.

$1,000

Wheelers Hill VIC, Australia

22nd Jun 2021

The job needs to be done in two stages in an urgent basis as the water issue cause damages to foundation: Stage 1: Check with CCTV camera for any blockage and misalignment of all downpipes and drains for leakage of water at all points and underground stormwater drains for the whole house (front, sides and back, Photos Slides 3-11). See drawing slide for details. Please note the house is 40 over years old. We need a comprehensive report of the inspection as stage 2 is subject to inspection report. Please quote for Inspection only and/or whole job. Three separate quotes are preferred Detailed scope are given in the drawings and photos. Remarks: Quote Stage 1 Duration: Job duration from start to complete one day/ two days.

Replace downpipes

$20

Wheelers Hill VIC, Australia

21st Apr 2019

Downpipes need replacing, I need quote before work thanks

Rerouting and install new downpipe, over-ground st

$2,100

Wheelers Hill VIC, Australia

24th Jul 2021

DETAILS of approximate scopes of the project (Any better idea is acceptable; DRAWING AND photos added) The job needs to be done in six tasks in an urgent basis as the water issue cause damages to foundation. See slide 2 for the overall plan around the house. The job is not challenging needs routing with PVC pipes and installation of a new downpipe. : Task 1: Rerouting existing downpipe and add new downpipe, join then with a Tee and draw PCV (90mm) pipe to the far end downpipe with a Tee (Slides 3,4) Task 2: Seal (plugged off) the bottom part of the backside downpipe and connect to the top part of the downpipe with a pipe to the nearby downpipe of the gutter of the shade. (Slides 5,6) Task 3: Seal (plugged off) shade through downpipe and connect an elbow to join with the gutter of the shade. (Slides 7, 8) Task 4: connect the new downpipe with an over ground PVC 90 mm pipe to Deck corner of stormwater pipe with a Tee (Slides 9,10,11). Need cutting concrete and put the run the storm water pipe to the corner stormwater pipe of the deck. Replace the cut concrete and level it. Task 5: Fill opening of the ducted hear base with polythene and low permeable filler (Slide 12) Task 6: Seal the edge of the concrete and the wall with silicon or levelling grout (Slide 13) Detailed scope are given in the drawings and photos. Remarks: Please go through the scope of the works carefully (Tasks 1-6), state the commencement date and quote the job. Duration: Job duration from start to complete three days to one week.

Install new downpipe, raise connecting storm pipes

$2,600

Wheelers Hill VIC, Australia

18th Jun 2021

The job needs to be done in an urgent basis as the water issue cause damages to foundation. Inspection and install new downpipe, overground stormwater pipes and raise connecting T-junction pipes for underground stormwater pipes DETAILS of approximate scopes of the project (Any better idea is acceptable; DRAWING AND photos added) The job needs to be done in two stages in an urgent basis as the water issue cause damages to foundation: Stage 1: Check with CCTV camera for any blockage and misalignment of all downpipes and drains for leakage of water at all points and underground stormwater drains for the whole house (front, sides and back, Photos Slides 9-13). See drawing slide for details. Please note the house is 40 over years old. We need a comprehensive report of the inspection as stage 2 is subject to inspection report. Please quote for Inspection only and/or whole job. Three separate quotes are preferred Stage 2: This stage is based on the comprehensive report by an Foundation Engineer The camera inspection report will be verified by an expert engineer and the tasks may vary, but the approximate scope of the project are as follows (Approximate scope of the work is given in the Scope drawing. Any better idea is welcome.) See drawing slide 2. (a) Raise the connecting pipes from underground stormwater pipe to the concrete surface level (5 places see slide 2) Also see photos attached. (b) Concrete cutting near downpipe is required to raise the T-joint of the stormwater pipes. (c) Deviation of existing downpipe with inclined one and a straight one (slides 3,4) and add bigger downpipe for excess water flow from the roof gutters. Bigger stormwater pipes (diameter ≥90 mm) are needed in all new downpipes installations where more than one down pipes are connected. If drains are not good condition then it need to bypass (see figure Slides 3,4) If backside of garage downpipe is not connected with stormwater pipe then seal the mouth of the downpipe at the gutter and change slope to drain the water from the front done pipe (see Slide 5). Connection of rainwater pipe with underground pipe or overground deviation to the corner of the deck downpipe (Slides 6 &7) Fill opening of the ducted heat base with polythene and low permeable filler (Slide 8, photo). Reconcrete all the cut concrete areas. Detailed scope are given in the drawings and photos. Remarks: Quote Stages separately Remarks: Quote both Stages 1 & 2 Therefore, you can provide three quotes: (1) inspection report with camera only; (2) Stage 2 only and (3) Combined quote for stages 1 &2. Duration: Job duration from start to complete one week.