20 Kitchen Renovation Professionals in Geelong

Receive no-obligation quotes from reviewed, rated & trusted Kitchen Renovators in minutes.

I need
In
    available now
    available now
    Now Available!
    • Get it done now. Pay later.
    • Repay in 4 fortnightly instalments
    • No interest
    • Available on payments up to $1,500

    What is Airtasker?

    1

    Post your task

    Tell us what you need, it's FREE to post.

    2

    Review offers

    Get offers from trusted Taskers and view profiles.

    3

    Get it done

    Choose the right person for your task and get it done.

    Now Available!
    • Get it done now. Pay later.
    • Repay in 4 fortnightly instalments
    • No interest
    • Available on payments up to $1,500

    What does a kitchen renovation include?

    Every kitchen renovation project starts with planning and design - making sure you know what elements you want to change, remove, and update, and how much it’ll likely cost. Because you may not need to do a complete gut and rebuild. If some parts are still in good condition and fit with the new design, you may be able to keep them as-is and save your budget for other features. After planning your reno (and relocating all the food and crockery), the next steps will depend on what you’ve included in your plans:

    Demolishing your existing kitchen

    Usually, the first step your kitchen renovator will take is to rid of your existing kitchen or any parts in it that you won’t be keeping. They’ll start by removing the existing cabinet doors and cabinet bases, followed by doorway and window trims. Then they’ll shut your power off and remove built-in appliances and light fixtures. If you’re replacing the wall panels and flooring, they’ll be removed last. You’ll need to safely store anything you want to salvage and you may need to organise rubbish removal to clear your space for the installation.

    Installing new appliances

    Once you’ve bought your new appliances, such as ovens, stovetops, fans, and lights, they’ll usually need to be installed by a qualified electrician. They’ll start by turning off the power, water, and gas. Then they’ll install your new appliance, check that it is safe, secure, and level, and then test that it’s working properly. Once your appliance installer is done, they’ll turn the power back on.

    Installing cabinets 

    Cabinets are the centrepiece of your kitchen, so it’s worth investing in a professional installation. Usually a cabinet maker, carpenter, or cabinet installer will review your kitchen layout, check that they’ve got all the right pieces, and then start assembling your cabinets. They’ll secure each cabinet to the one next to it, as well as the walls. They’ll use a spirit level to check that each cabinet is plumb and level, so they’re ready for the benchtops, crown moulding, and scribe moulding. 

    Installing new countertops

    Once your cabinets are in place, your kitchen renovator can collaborate with a benchtop installer to add your new countertop. Depending on your kitchen layout, you may be able to purchase an off-the-shelf kitchen benchtop. Otherwise, you’ll need to customise an existing benchtop or commission a custom one to fit your space. Countertop installation involves mounting the countertop to your cabinets and walls, before securing it in place with glue, screws, and brackets. Finally, your countertop installer will seal any edges and clear up any waste. 

    Installing new flooring

    When installing new kitchen flooring, most people choose easy to clean, hardwearing options, such as tiles, slate, or linoleum. Once your existing flooring is removed, your flooring contractor will clear dust and debris from the area. If they notice any height or level issues with the floor, your kitchen renovator may attempt to level your flooring out, then prepare the surface with soundproofing, moisture barriers, and underlay. Your floor installer will use adhesives (like glue or cement) to secure your new flooring down. Once all the flooring is installed, they’ll check again to ensure everything is level and all edges are sealed, before installing mouldings and finishings so there’s no gaps between your flooring and cabinetry.

    Recent Kitchen Renovation tasks in Geelong

    New bathroom,kitchen renovation,two decks,timing

    $9,000

    Herne Hill VIC, Australia

    25th Sep 2020

    Full new bathroom Plastering and blue board General framing and carpentry Lots of tiling Moving plumbing Installing new tap ware Installing new windows and doors New kitchen bench tops installed Rebuilding and reconfiguring laundry and sunroom from current floor up Fixing and retiling existing front deck Adding new rear tiled landing All fitout materials provided by client

    Kitchen Reno

    $1,000

    Lara VIC 3212, Australia

    28th May 2020

    Dig trench move kitchen pipes, then when kitchen finished ( soon) connect dishwasher, taps, move plumbing for fridge, connect cook top

    Kitchen renovation

    $3,000

    Corio VIC, Australia

    30th Sep 2020

    Remove old cupboards. Replace with Kaboodle cupboards to be assembled. Plaster walls and remove window

    Kitchen Reno. Create an open plan kitchen

    $1,000

    Hamlyn Heights, Victoria, Australia

    7th Jun 2017

    House in Hamlyn Heights near Geelong requiring a kitchen reno. Currently a U shaped kitchen to be turned into a L shape. Need quotes done asap. Can show the kitchen. Budget: It depends on what ,needs to be done so hard to put a price on it. Come and see it and then will work it out.