A white van parked on a street, with a person standing next to it, ready to load or unload items.
A white van parked on a street, with a person standing next to it, ready to load or unload items.

Find local bathroom renovation experts in North Brisbane

Fill in a short form and get free quotes for professional bathroom renovation services in North Brisbane

4.5

Excellent rating - 4.5/5 (9200+ reviews)

Need help with bathroom renovation?

  • Quote and planning
  • Demolishing your old bathroom
  • Prep for new bathroom
  • Adding your new fixtures
  • Final inspection and clean
  • … or anything else
It only takes 2 minutes. And it's free.
Up to 50% cheaper than franchise dealers
No job too big or small
Free insurance coverage
Secure cashless payments
Same day or next day service at no extra cost

Best rated bathroom renovators near me

Recent Bathroom Renovation reviews in North Brisbane

Great job. Clear communication. Very helpful. Thanks!

Electrical work for bathroom renovation

$300

Madz did a great job very happy with his work

Bathroom Renovation

$123

The second time I have used John - he is thorough, has great attention to detail and easy to work with. Highly recommended, thank you 😊

Hanging doors, mounting bathroom fixtures & fittings

$300

Such a great guy and a pleasure having over at our place. Worked incredibly hard all day for us. Will definitely get Ian to do more work.

Bathroom Renovation - building stud frames

$650

Average reviews for Bathroom Renovation Services in North Brisbane

based on 4 reviews

5

4
0
0
0
0

What is Airtasker?

Post your task

Post your task

Tell us what you need, it's FREE to post.

Review offers

Review offers

Get offers from trusted Taskers and view profiles.

Get it done

Get it done

Choose the right person for your task and get it done.

Now Available
  • Get it done now. Pay later.
  • Repay in 4 fortnightly instalments
  • No interest
  • Available on payments up to $0

What does a bathroom renovation include?

Experienced handymen, plumbers, and builders can help with small cosmetic changes to your bathroom. They’ll replace showerheads, taps, fit a shower screen door, or even plumb your toilet. But if you’re looking for a complete bathroom overhaul, you need a bathroom renovation specialist. Here’s what you can expect when working with bathroom renovation contractors and tradies:

Step 1. Quote and planning

Your bathroom renovator will normally need to visit your property to create an accurate quote. They’ll base their costings on the size of your bathroom, how long the project will take (usually 13-25 days for a whole bathroom renovation), and materials needed. You’re responsible for choosing and ordering any new fixtures and fittings - bath, toilet, units, tiles, etc. These should be paid for and delivered before the building start date. Your contractor will sent through the quote and draw up a blueprint for all tradespeople to work from, to ensure the project is kept on track.

Step 2. Demolishing your old bathroom

Builders and demolition professionals will strip out your old bathroom and knock through any walls. They’ll remove fixtures and either bin them, put them into storage, or cover them up so they’re protected during building work.

Step 3. Prep for new bathroom

Next, your plumber and electrician will carry out a rough-in fit. This means putting plumbing and electrical wiring in place without connecting it. Next, your carpenter, plasterer, and tiler will build or prepare your walls and floor for decorating. This can take 2-5 days depending on the size of your bathroom and drying time needed for plastering, rendering, and your undercoat of paint.   

Step 4. Adding your new fixtures

Here you’ll really see your new bathroom come to life. First, your tiler will lay tiles and your painter will paint the walls. Once these are dry, your new bathroom furniture can be moved in. Your plumber and electrician now complete any connections. Your contractors will apply waterproofing and sealant around sinks, showers, and bathtubs. Finally, glass fixtures, like mirrors or shower doors, are installed.

Step 5. Final inspection and clean

With everything installed and dry, your bathroom renovator will carry out a final inspection. They’ll clear away and dispose of any bits leftover by the tradies. Your contractor might complete a basic clean, but you might also want to book a renovation cleaning service so your new bathroom is absolutely spick and span.

Recent Bathroom Renovation tasks in North Brisbane

BATHROOM RENOVATION WITH WATERPROOFING

$10

McDowall, Queensland, Australia

23rd Mar 2024

Just the basic level bathroom Renovation and waterproofing. Need to do it only beacause of a crack on the fibre tray on the bathroom floor. Please message your quote in the reply/comment box first!

Bathroom Renovation

$123

Zillmere QLD, Australia

5th Feb 2024

I have a small bathroom where the waterproofing has failed and the floorboards underneath have evidence of water damage. Looking to gut the bathroom to the frame and joists and redo from scratch. Final bathroom size will be approximately 1900 x 2400 with high ceilings. Walls may contain asbestos and will get tested prior to work. Bathroom work to include: • Full demo of current bathroom • Removal of linen cupboard • Inspection of joists • Plumbing • Minor Electrical work • New waterproof subfloor • Removing old Vertical window and installing horizontal window • Framing as required • Wall Sheeting • Waterproofing • Tiling • Install Bathtub/Shower Combo, Toilet, and Vanity • Door and fittings • Etc Photos attached show current bathroom and possible future layout. Final design and fittings to be discussed through in consultation. House is 1960s build on concrete stumps. - Due date: Flexible

Need help with bathroom reno, painting, and repairs in a small villa

$20

Taigum QLD, Australia

28th Dec 2023

Need help with a bathroom reno, painting and small repairs in a villa. Bathroom Reno - Full renovation of a small bathroom, removing existing shower over tub, vanity, and tiling, replacing with shower, new vanity and tiling to ceiling. Full service including waterproofing required. We can supply some supplies (tiling, tapware, shower head, vanity) Painting - Professional painting of a two bedroom villa including entry way, two bedrooms, living room, bathroom, separate toilet, and connected garage. Walls, cupboard doors, skirting, patch repair on the roof in the kitchen, and kitchen cabinetry too. Small repairs - fixing a retaining wall in the courtyard, and fixing a small concrete strip by the front door. We need the work to be carried out between Jan 12 - 31, by licensed and insured trades, with an itemised quote and invoice please. Am hoping to get 2-3 quotes so I can compare. Thank you so much for your time. - Due date: Flexible

Bathroom renovation

$80

Taigum QLD, Australia

27th Dec 2023

Full renovation of a small bathroom, removing existing shower over tub, vanity, and tiling, replacing with shower, new vanity and tiling. Full service including waterproofing required. Please provide an itemised quote - my husband may be able to supply shower head, vanity, tap ware, tiling, grout, waterproofing and glue/silicone supplies if more cost efficient (NB not labour). See details in pics. Hoping to do this as bathtub in rental property is old and we may have a water proofing issue. Will need a proper receipt please for tax purposes. If possible, also need a builder to help fix a retaining wall in the property courtyard. Please see pics and quote separately if feasible. Due date flexible, but ideally between Jan 8 and 26. Thank you so much - Due date: Flexible

Bathroom renovation

$1,000

Zillmere QLD, Australia

21st Nov 2023

Need to renovate toilet and bathroom.also need to change the direction of the entrance of the bathroom - Due date: Flexible

Qualified carpenter for bathroom renovation

$10

Bridgeman Downs QLD, Australia

29th Sep 2023

Bathroom (ensuite) renovation due to leak. Pictures attached. Repair/replace beam/floor/walls as required. Flexible with timing however prefer sooner rather than later. Happy to agree on price…. - Due date: Flexible

Bathroom renovation

$1,500

Bridgeman Downs QLD, Australia

25th May 2023

Remove step from shower and replace door, so that floor is flat. Will need to be ceiling of tiles under the door, ground floor area. - Due date: Flexible

Bathroom renovations x 2, kitchen revamp, new lights

$9,000

Bracken Ridge QLD 4017, Australia

2nd May 2023

2 x Bathrooms (1 x bathroom single shower & 1 x ensuite double shower) BOTH require: • Retiling, • Shower stall removal (including one pan) • Replace shower stall with fixed panel (discuss preferences with owner) • Some fittings replacement (discuss necessities with owner) • Vanity and sink replacement • Mirrors (owner would like to salvage/save mirrors if possible) • Light/heat & exhaust fan replacement with single unit • Toilets may/may not require replacement (discuss with owner) NOTE: Quote each bathroom separately. Owner may wish to complete them individually based on cost, time and disruption (discuss with owner) NOTE: Owner requires other services that you are welcome to also quote individually on; IF you are interested in that work (Discuss with owner) • Replace all light fittings in the home with down lights • Refresh existing kitchen with new cupboard doors, drawers and hardware, new modern sink with fittings and appropriate plumbing. • Internal home repaint; walls and ceilings. NOTE: Owners time is limited. With respect; please be punctual to any appointment you make for inspection. - Due date: Flexible

Finish Bathroom Reno

$100

Geebung QLD, Australia

30th Apr 2023

Sorry if anyone saw this last week had a tech issue. Have started Reno on bathroom. Now need it finished. Already have most fittings and fixtures and will source rest before install. Need floor (just the base tiles already removed) fully removed Walls and floor redone, waterproofed & fully tiled. Taps moved for shower (only taps) & vanity drain moved to wall from floor, no other plumbing moved. Plus all else installed including but not limited to basin, shower screen, plumbing, toilet etc. Must be able to certify waterproofing work etc. Please feel free ask if not clear. Budget unclear ( Have funds ready for job though) - looking for quote at this stage. Thanks Will upload photos soon - Due date: Flexible

Bathroom renovation

$4,000

Boondall QLD, Australia

28th Feb 2023

Bathroom renovation guide - Due date: Flexible

Bathroom Renovation / relocation of laundry

$10

Kedron QLD 4031, Australia

27th Feb 2023

Looking to renovated a bathroom. Replace Floor to ceiling tiles, reconfigure toilet direction. Reconfigure shower to be a ceiling rain shower etc Remove laundry from bathroom and relocate to spare room. Would like in person discussion of options and to then provide formal quote and availability etc - Due date: Flexible

Small bathroom renovation

$25

Bracken Ridge QLD 4017, Australia

26th Feb 2023

We have a small bathroom that needs renovating. The bath will be permanently removed to allow for a bigger shower, a new shower screen, tiled and vanity and tapware installed. Would like this started and completed within the month of May. This a temporary solution as the house will eventually be demolished in a year or 2 so nothing fancy or expensive required. - Due date: Before Wednesday, 31 May 2023

Bathroom renovation

$2,500

McDowall QLD, Australia

19th Feb 2023

Small ensuit bathroom (floor=4 sqm, wall=4 sqm), demolish floor and wall tiles and shower screen, water proofing, install new tiles, grouting and sealing, put the toilet bowl and taps back. no basin/mirror needed. remove the rubbish. - Due date: Flexible

Bathroom renovations

$5

Aspley QLD, Australia

27th Dec 2022

Looking for quotes to complete a 2 bathroom renovations will require re plumbing - Due date: Flexible

Plastering for bathroom renovations

$100

Northgate QLD, Australia

13th Aug 2022

Hi I am having two bathrooms renovated and need a plasterer. I am not sure exactly what needs to be done but have a builder involved so he can direct. Not expecting it will be a big job. - Due date: Flexible

Plumbing-Bathroom renovation

$1,200

McDowall QLD, Australia

9th Jul 2022

1. Changing the S trap toilet to wall hung toilet (P trap) and install inwall Cistern. 2. Changing Vanity tap to the inwall mixer and reposition drain from floor to the wall for wall hung vanity. 3. Install bathroom mixer and shower head 4. Install bathtub mixer 5. Reposition laundry tap - Due date: Flexible

Bathroom renovation

$7,500

Chermside QLD, Australia

8th Jul 2022

* Removal and disposal of all the asbestos in the bathroom area. * Complete bathroom strip out including removal of toilet and shower base * Capping off plumbing * Removal of rubbish/waste * Waterproofing * Tiling of walls and sheeting of ceiling * Provision and installation of shower, toilet suite and vanity / sink *Tiling of floor Small 3sqm powder-room / bathroom - Due date: Flexible

Small bathroom reno

$2,000

Taigum QLD, Australia

20th Jun 2022

Hello, I am wanting to re-do 2bathrooms on a budget but starting with 1 first. I would like to discuss what needs to be done and go from there but we are looking at re-tiling floor, walls, shower and vanity. thanks - Due date: Flexible

Bathroom reno and tiling + regrouting

$500

Stafford Heights QLD 4053, Australia

4th May 2022

Hello, looking to regrout tiles, add tiles and replace vanity and other bathroom alterations. Please ignore price and visit to give cost estimate and so I can explain task. Address I can give via message. Cheers