20 Kitchen Renovation Professionals in Baulkham Hills & Hawkesbury

Receive no-obligation quotes from reviewed, rated & trusted Kitchen Renovators in minutes.

I need
In
    available now
    available now

    Best rated Kitchen Renovators in Baulkham Hills & Hawkesbury

    Angelo S

    NSW

    (501)

    Latest Review

    "Would use again for any gas fitter related issues"

    Verified Badges

    Digital iD Verified

    NSW Plumbing Verified

    NSW Gasfitting Verified

    Mobile Verified

    Aymz M

    NSW

    (6)

    Latest Review

    "Perfect guy. Professional, reliable, responsive and punctual."

    Verified Badges

    Mobile Verified

    Facebook Verified

    Mark B

    NSW

    (115)

    Latest Review

    "Good work promptly done. "

    Verified Badges

    Mobile Verified

    Facebook Verified

    Now Available!
    • Get it done now. Pay later.
    • Repay in 4 fortnightly instalments
    • No interest
    • Available on payments up to $1,500

    What is Airtasker?

    1

    Post your task

    Tell us what you need, it's FREE to post.

    2

    Review offers

    Get offers from trusted Taskers and view profiles.

    3

    Get it done

    Choose the right person for your task and get it done.

    Now Available!
    • Get it done now. Pay later.
    • Repay in 4 fortnightly instalments
    • No interest
    • Available on payments up to $1,500

    What does a kitchen renovation include?

    Every kitchen renovation project starts with planning and design - making sure you know what elements you want to change, remove, and update, and how much it’ll likely cost. Because you may not need to do a complete gut and rebuild. If some parts are still in good condition and fit with the new design, you may be able to keep them as-is and save your budget for other features. After planning your reno (and relocating all the food and crockery), the next steps will depend on what you’ve included in your plans:

    Demolishing your existing kitchen

    Usually, the first step your kitchen renovator will take is to rid of your existing kitchen or any parts in it that you won’t be keeping. They’ll start by removing the existing cabinet doors and cabinet bases, followed by doorway and window trims. Then they’ll shut your power off and remove built-in appliances and light fixtures. If you’re replacing the wall panels and flooring, they’ll be removed last. You’ll need to safely store anything you want to salvage and you may need to organise rubbish removal to clear your space for the installation.

    Installing new appliances

    Once you’ve bought your new appliances, such as ovens, stovetops, fans, and lights, they’ll usually need to be installed by a qualified electrician. They’ll start by turning off the power, water, and gas. Then they’ll install your new appliance, check that it is safe, secure, and level, and then test that it’s working properly. Once your appliance installer is done, they’ll turn the power back on.

    Installing cabinets 

    Cabinets are the centrepiece of your kitchen, so it’s worth investing in a professional installation. Usually a cabinet maker, carpenter, or cabinet installer will review your kitchen layout, check that they’ve got all the right pieces, and then start assembling your cabinets. They’ll secure each cabinet to the one next to it, as well as the walls. They’ll use a spirit level to check that each cabinet is plumb and level, so they’re ready for the benchtops, crown moulding, and scribe moulding. 

    Installing new countertops

    Once your cabinets are in place, your kitchen renovator can collaborate with a benchtop installer to add your new countertop. Depending on your kitchen layout, you may be able to purchase an off-the-shelf kitchen benchtop. Otherwise, you’ll need to customise an existing benchtop or commission a custom one to fit your space. Countertop installation involves mounting the countertop to your cabinets and walls, before securing it in place with glue, screws, and brackets. Finally, your countertop installer will seal any edges and clear up any waste. 

    Installing new flooring

    When installing new kitchen flooring, most people choose easy to clean, hardwearing options, such as tiles, slate, or linoleum. Once your existing flooring is removed, your flooring contractor will clear dust and debris from the area. If they notice any height or level issues with the floor, your kitchen renovator may attempt to level your flooring out, then prepare the surface with soundproofing, moisture barriers, and underlay. Your floor installer will use adhesives (like glue or cement) to secure your new flooring down. Once all the flooring is installed, they’ll check again to ensure everything is level and all edges are sealed, before installing mouldings and finishings so there’s no gaps between your flooring and cabinetry.

    Recent Kitchen Renovation tasks in Baulkham Hills & Hawkesbury

    Plumber required - bathroom & kitchen renovation

    $5

    Kellyville NSW 2155, Australia

    13th Dec 2018

    We are renovating our house. I need a QUOTE for plumbing - start to end of job. Ensuite; involves cutting up the concrete to move the toilet and shower about 1m each. Kitchen; moving the sink from wall to island and also an additional sink and dishwasher in the bar. Would also like job done between now and the new year so if you have no plans over xmas we may go ahead with your quote

    Plastering wall after kitchen renovation

    $400

    Castle Hill, NSW

    12th Mar 2016

    The walls in our kitchen need to be plastered and painted and three bulkheads need to be corniced and painted

    Plumbing on kitchen renovations

    $500

    Cherrybrook NSW, Australia

    29th Oct 2019

    I need a kitchen sink, dishwasher and mixer disconnected to prepare kitchen for renovation. Need to have all reconnected a week or two later. New sink, mixer, no pipes to move.

    Thanks, great job

    Kitchen Renovation Services
    Kitchen Renovation Services
    something else…

    available now