Find local bathroom renovation experts in Sunshine Coast

Fill in a short form and get free quotes for professional bathroom renovation services in Sunshine Coast

4.5

Excellent rating - 4.5/5 (9200+ reviews)

Need help with bathroom renovation?

  • Quote and planning
  • Demolishing your old bathroom
  • Prep for new bathroom
  • Adding your new fixtures
  • Final inspection and clean
  • … or anything else
It only takes 2 minutes. And it's free.
Up to 50% cheaper than franchise dealers
Up to 50% cheaper than franchise dealers
No job too big or too small
No job too big or too small
Free insurance coverage
Free insurance coverage
Secure cashless payments
Secure cashless payments
Same day / next day service available
Same day / next day service available

Best rated bathroom renovations near me

What is Airtasker?

1

Post your task

Post your task

Tell us what you need, it's FREE to post.

2

Review offers

Review offers

Get offers from trusted Taskers and view profiles.

3

Get it done

Get it done

Choose the right person for your task and get it done.

Now Available!
  • Get it done now. Pay later.
  • Repay in 4 fortnightly instalments
  • No interest
  • Available on payments up to $1,500

Suggested reads about Bathroom Renovation

What does a bathroom renovation include?

Experienced handymen, plumbers, and builders can help with small cosmetic changes to your bathroom. They’ll replace showerheads, taps, fit a shower screen door, or even plumb your toilet. But if you’re looking for a complete bathroom overhaul, you need a bathroom renovation specialist. Here’s what you can expect when working with bathroom renovation contractors and tradies:

Step 1. Quote and planning

Your bathroom renovator will normally need to visit your property to create an accurate quote. They’ll base their costings on the size of your bathroom, how long the project will take (usually 13-25 days for a whole bathroom renovation), and materials needed. You’re responsible for choosing and ordering any new fixtures and fittings - bath, toilet, units, tiles, etc. These should be paid for and delivered before the building start date. Your contractor will sent through the quote and draw up a blueprint for all tradespeople to work from, to ensure the project is kept on track.

Step 2. Demolishing your old bathroom

Builders and demolition professionals will strip out your old bathroom and knock through any walls. They’ll remove fixtures and either bin them, put them into storage, or cover them up so they’re protected during building work.

Step 3. Prep for new bathroom

Next, your plumber and electrician will carry out a rough-in fit. This means putting plumbing and electrical wiring in place without connecting it. Next, your carpenter, plasterer, and tiler will build or prepare your walls and floor for decorating. This can take 2-5 days depending on the size of your bathroom and drying time needed for plastering, rendering, and your undercoat of paint.   

Step 4. Adding your new fixtures

Here you’ll really see your new bathroom come to life. First, your tiler will lay tiles and your painter will paint the walls. Once these are dry, your new bathroom furniture can be moved in. Your plumber and electrician now complete any connections. Your contractors will apply waterproofing and sealant around sinks, showers, and bathtubs. Finally, glass fixtures, like mirrors or shower doors, are installed.

Step 5. Final inspection and clean

With everything installed and dry, your bathroom renovator will carry out a final inspection. They’ll clear away and dispose of any bits leftover by the tradies. Your contractor might complete a basic clean, but you might also want to book a renovation cleaning service so your new bathroom is absolutely spick and span.

Recent Bathroom Renovation tasks in Sunshine Coast

Bathroom renovation

$5

Parrearra QLD, Australia

10th Sep 2022

Price TBC- would prefer a discussion. We want a bath! Current bathroom has shower and 2 sinks, we’d like it transformed to a bath with overhead shower, 1x sink and 1x toilet. Completed before Christmas. Dimensions roughly 2x2m, with small window. - Due date: Before Tuesday, 20 December 2022

Tiling and bathroom reno

$2,000

Mountain Creek QLD, Australia

29th May 2022

Needing a quote for professional tiling and shower reframing. - Due date: Before Monday, 13 June 2022

Bathroom renovation. Room is 10m2

$5,000

Buderim QLD 4556, Australia

9th Feb 2022

Bathroom renovation. Take out old bathtub and install new. Take off old cupboard top and install granite. Toilet to stay as is. shower to stay as is but new floor and wall tiles. - Due date: Flexible

Bathroom reno (Capenter)

$1,500

Burnside QLD, Australia

15th Oct 2021

We are looking for a reliable Capenter to help reno a small bathroom . fit and build the bath in , shampoo shelves , fit vanity , possibly new walls after we rip old tiles out - Due date: Needs to be done on Wednesday, 10th Nov 2021

Plastering on small bathroom reno

$200

Wurtulla QLD, Australia

12th Aug 2021

Small bathroom Renovation. Apply some sheeting. About 1 x 2400x1200 cut into about 3 pieces. 3 external corners and a couple of internal. Tradesman only

Bathroom renovation.

$800

Noosa North Shore QLD, Australia

18th Feb 2021

Small ensuite bathroom renovation. No tiling needed.

Painting, bathroom Reno, Bedroom flooring etc

$1,600

Maroochydore, Queensland, Australia

15th Nov 2020

Painting whole inside of house Bathroom Reno, bedroom flooring

Plumber for bathroom reno

$5

Wurtulla QLD, Australia

29th Aug 2022

Rough in for bathroom reno then completion after tiling. Turning off water to kitchen.

Painting post bathroom reno

$300

Coolum Beach QLD, Australia

26th Apr 2022

Just need someone to paint my bathroom and powder room, has just undergone a reno and needing a good painter that can help with finishing touch, am negotiable on price and happy for quotes before hand

Carpenter or Handyman for some bathroom renos

$2,000

Nambour QLD, Australia

27th Jan 2022

Remove old laundry tub, make a gyprock wall & doorway to enclose laundry & bathroom. Box in some areas. - Due date: Before Monday, 7th Feb 2022

Bathroom renovation

$5,000

Mooloolaba QLD, Australia

19th Sep 2021

Renovations to upstairs bathroom in 3 bedroom town house ,demolish vanity, bath, shower and tiles. Install new tiles, bath, shower, vanity. Tiles replacement in seperate toilet.

Bathroom Reno sun coast

$1,234

Mooloolaba QLD, Australia

10th Jun 2021

Bathroom Reno, advice, labour etc. assistance and materials supplied. Handyman/retired/unemployed builder - references required. Ability to sight previous work. Must be reliable.

Bathroom Reno

$240

Nambour QLD, Australia

8th Dec 2020

I need someone to remove old flooring and replace with new subfloor.

Bathroom reno

$5

Noosaville QLD 4566, Australia

19th Sep 2022

Remove the existing spa bath and replace with shower. Remove vanity and toilet and replace with new. Floor and matching wall tiles. Size of bathroom 295 x 130cm - Due date: Flexible

Kitchen + 2 Bathroom Renovation

$9,999

Mountain Creek QLD, Australia

22nd Aug 2022

- Remove old kitchen cabinets and prep space for IKEA kitchen - Install new IKEA kitchen - Renovate two small bathrooms, we have most materials already

Kitchen / bathroom Reno

$4,000

Leopold VIC 3224, Australia

13th Feb 2022

I’ll supply all the material just labour . Will be demolished. Just need quote to fit cabinet , shower tiling etc

Bathroom reno

$2,500

Coes Creek QLD, Australia

8th Nov 2021

2 shower screens and bases replaced. 1 toilet replaced Small amount of tiling and waterproofing - Due date: Before Monday, 20th Dec 2021

Fixing door rollers, window repairs, bathroom reno

$2,000

Coolum Beach QLD, Australia

30th Aug 2021

Looking at renovating a 3m x 3m bathroom in a unit. Removal of wall tiles, fixing rollers on glass doors. Some painting work also.

BATHROOM RENOVATION GOLDEN BEACH

$5

Golden Beach QLD, Australia

3rd Mar 2021

Must be able to complete asap ie 2 weeks 15/3/21 Need complete ripping out of existing bathroom and replace. Budget bathroom - (small approx 1.5 x 1.5m) To quote for everything please: Electrician Tiler Plasterer remove cornice Plumber Carpentry Material as required: 900mm Vanity/sink/tap ware etc Glass panel/drain Towel rail shower hose soap holder replace old power point plaster as needed/painting ceiling mirror as fitting allows across bathroom approx 1.5

Part bathroom reno

$40

Tewantin QLD, Australia

16th Nov 2020

Basically, change the cupboard and mirror. New cupboard (needs to be the same size then the old one, not enough original floor tiles left) and mirror cupboard. Jobs need to be done, demolition, plastering, tiling and installation new furniture. We have a plumber.