A white van parked on a street, with a person standing next to it, ready to load or unload items.
A white van parked on a street, with a person standing next to it, ready to load or unload items.

Find local bathroom renovation experts in Hobart

Fill in a short form and get free quotes for professional bathroom renovation services in Hobart

4.5

Excellent rating - 4.5/5 (9200+ reviews)

Need help with bathroom renovation?

  • Quote and planning
  • Demolishing your old bathroom
  • Prep for new bathroom
  • Adding your new fixtures
  • Final inspection and clean
  • … or anything else
It only takes 2 minutes. And it's free.
Up to 50% cheaper than franchise dealers
No job too big or small
Free insurance coverage
Secure cashless payments
Same day or next day service at no extra cost

Best rated bathroom renovators near me

What is Airtasker?

Post your task

Post your task

Tell us what you need, it's FREE to post.

Review offers

Review offers

Get offers from trusted Taskers and view profiles.

Get it done

Get it done

Choose the right person for your task and get it done.

Now Available
  • Get it done now. Pay later.
  • Repay in 4 fortnightly instalments
  • No interest
  • Available on payments up to $1,500

What does a bathroom renovation include?

Experienced handymen, plumbers, and builders can help with small cosmetic changes to your bathroom. They’ll replace showerheads, taps, fit a shower screen door, or even plumb your toilet. But if you’re looking for a complete bathroom overhaul, you need a bathroom renovation specialist. Here’s what you can expect when working with bathroom renovation contractors and tradies:

Step 1. Quote and planning

Your bathroom renovator will normally need to visit your property to create an accurate quote. They’ll base their costings on the size of your bathroom, how long the project will take (usually 13-25 days for a whole bathroom renovation), and materials needed. You’re responsible for choosing and ordering any new fixtures and fittings - bath, toilet, units, tiles, etc. These should be paid for and delivered before the building start date. Your contractor will sent through the quote and draw up a blueprint for all tradespeople to work from, to ensure the project is kept on track.

Step 2. Demolishing your old bathroom

Builders and demolition professionals will strip out your old bathroom and knock through any walls. They’ll remove fixtures and either bin them, put them into storage, or cover them up so they’re protected during building work.

Step 3. Prep for new bathroom

Next, your plumber and electrician will carry out a rough-in fit. This means putting plumbing and electrical wiring in place without connecting it. Next, your carpenter, plasterer, and tiler will build or prepare your walls and floor for decorating. This can take 2-5 days depending on the size of your bathroom and drying time needed for plastering, rendering, and your undercoat of paint.   

Step 4. Adding your new fixtures

Here you’ll really see your new bathroom come to life. First, your tiler will lay tiles and your painter will paint the walls. Once these are dry, your new bathroom furniture can be moved in. Your plumber and electrician now complete any connections. Your contractors will apply waterproofing and sealant around sinks, showers, and bathtubs. Finally, glass fixtures, like mirrors or shower doors, are installed.

Step 5. Final inspection and clean

With everything installed and dry, your bathroom renovator will carry out a final inspection. They’ll clear away and dispose of any bits leftover by the tradies. Your contractor might complete a basic clean, but you might also want to book a renovation cleaning service so your new bathroom is absolutely spick and span.

Recent Bathroom Renovation tasks in Hobart

Bathroom renovation

$9,999

Bellerive TAS, Australia

10th Jan 2024

complete bathroom renovation - Due date: Flexible

Bathroom renovation

$20

Howrah TAS, Australia

13th Dec 2022

Small bathroom renovation needed. Will need gutting of old bathroom and install of new bathroom. Looking at Bunnings bathroom install. - Due date: Flexible

Bathroom renovation

$9,999

Berriedale TAS 7011, Australia

5th Jul 2022

3x2m bathroom Replace yellow tounge flooring Fix plumbing leak and small alteration of tap placement Floor to ceiling tiles Water proof Install walk in shower vanity and bath - Due date: Flexible

Replace bathroom fixtures

$50

West Moonah TAS 7009, Australia

10th Mar 2022

Looking for some help from a plumber or handiperson to change out my basin mixer, showerhead, shower mixer and bath spout. I have minimal tools so you'll need to bring your own, please :)

Kitchen and bathroom renovation

$123

West Moonah TAS, Australia

21st Dec 2021

Very old house. Needs new kitchen, bathroom, laundry and new paint. Looking for someone to fix it up. - Due date: Flexible

I need bathroom renovation services

$5,000

Sandy Bay TAS 7005, Australia

15th Jul 2021

Adding an accessible shower to the existing bathroom. It will involve plumbing, attaching some kind of waterproof cladding (not tiling) to the walls, installing a shower screen, attaching a shelf, handrails and fold down seat.

Need handyman bathroom renovator for shower

$500

Hobart TAS, Australia

4th Jul 2021

Need someone to fit shower tray with slant into floor and fit cupboards in new bathroom

Good job and nice polite person

Bathroom Renovation

$9,999

West Hobart TAS, Australia

26th Sep 2020

Bathroom Renovation 1. Toilet -back to wall 2. Shower Bay - (a) remove fan (b) walk in shower (c) sloping base (d) one glass wall (e) niche for shampoo, etc. (f) tiled walls to ceiling (g) large shower head plus hand held (h)( waterproofing 3. Fan/Heater - (a) remove existing model (b) replace with "Tastic" model 4. Vanity Unit - (a) keep existing one? (b) or New One 5. Flooring - new tiles 6. Metal trims for bath surrounds 7. Remove and put back (a) one light & one power switches (b) light above mirror (c) mirror (d) wall objects 8. Bath - (a) retain as is (b) tile over existing tiles around bath (c) remove tiles in corners near windows 9. Toilet area - tiles. 10. Remove two other toilet systems and replace with two back to wall models. ***Pricing unknown until site inspection is implemented.