You're on our Australian site!

20 Bathroom Renovation Experts in Capital Region

Receive no-obligation quotes from reviewed, rated & trusted Bathroom Renovation Experts in minutes.

I need
In
  • Powered by Google
available now
available now
Now Available!
  • Get it done now. Pay later.
  • Repay in 4 fortnightly instalments
  • No interest
  • Available on payments up to $1,500

What is Airtasker?

1

Post your task

Tell us what you need, it's FREE to post.

2

Review offers

Get offers from trusted Taskers and view profiles.

3

Get it done

Choose the right person for your task and get it done.

Now Available!
  • Get it done now. Pay later.
  • Repay in 4 fortnightly instalments
  • No interest
  • Available on payments up to $1,500

What does a bathroom renovation include?

Experienced handymen, plumbers, and builders can help with small cosmetic changes to your bathroom. They’ll replace showerheads, taps, fit a shower screen door, or even plumb your toilet. But if you’re looking for a complete bathroom overhaul, you need a bathroom renovation specialist. Here’s what you can expect when working with bathroom renovation contractors and tradies:

Step 1. Quote and planning

Your bathroom renovator will normally need to visit your property to create an accurate quote. They’ll base their costings on the size of your bathroom, how long the project will take (usually 13-25 days for a whole bathroom renovation), and materials needed. You’re responsible for choosing and ordering any new fixtures and fittings - bath, toilet, units, tiles, etc. These should be paid for and delivered before the building start date. Your contractor will sent through the quote and draw up a blueprint for all tradespeople to work from, to ensure the project is kept on track.

Step 2. Demolishing your old bathroom

Builders and demolition professionals will strip out your old bathroom and knock through any walls. They’ll remove fixtures and either bin them, put them into storage, or cover them up so they’re protected during building work.

Step 3. Prep for new bathroom

Next, your plumber and electrician will carry out a rough-in fit. This means putting plumbing and electrical wiring in place without connecting it. Next, your carpenter, plasterer, and tiler will build or prepare your walls and floor for decorating. This can take 2-5 days depending on the size of your bathroom and drying time needed for plastering, rendering, and your undercoat of paint.   

Step 4. Adding your new fixtures

Here you’ll really see your new bathroom come to life. First, your tiler will lay tiles and your painter will paint the walls. Once these are dry, your new bathroom furniture can be moved in. Your plumber and electrician now complete any connections. Your contractors will apply waterproofing and sealant around sinks, showers, and bathtubs. Finally, glass fixtures, like mirrors or shower doors, are installed.

Step 5. Final inspection and clean

With everything installed and dry, your bathroom renovator will carry out a final inspection. They’ll clear away and dispose of any bits leftover by the tradies. Your contractor might complete a basic clean, but you might also want to book a renovation cleaning service so your new bathroom is absolutely spick and span.

Recent Bathroom Renovation tasks in Capital Region

Bathroom renovation

$500

Queanbeyan East NSW, Australia

18th Oct 2019

- Remove bath tub - Convert space into walk-in shower - Tiling - Shower installation - Budget can be discussed during the quote process Require a site visit We are available only on weekends Require a quote first please contact us to organise a site visit. [Content Moderated]

Bathroom renovation/tiling

$5

Braidwood NSW, Australia

10th Jun 2020

Old bathroom want to renovate , simple , minimal. Tiling Please send quotes. Thanks

Bathroom Renovation Batemans Bay Townhouse

$5

Batemans Bay NSW, Australia

8th Feb 2020

I will do strip out (the unit is vacant). The layout will remain the same, but the shower bath to be replaced with just corner shower. Scope will include: - Build and fit out the room economically to suit being tenanted and low maintenance; - Re route vanity waste into wall for wall mounted vanity; - Install wall mounted stop cocks in vanity unit and laundry cabinet; - Terminate bath taps and install shower flip mixer. - Fit timber in wall to support towel rail; - Refix wall sheeting; - Waterproof floor and walls; - Floor tiling and full height wall tiles including tile the window reveal; - Replacement laundry cabinet with new flip mixer; - Replacement wall mounted vanity unit and flip mixer; - Fit accessories; - Fit new bathroom door; and - Install new shower screen. If you are interested, bid a dollar for the job, advise your experience and time line for completion of these works. I will accept your bid and then we can exchange contact details and arrange an inspection and quote.

Bathroom renovation

$8,000

Tathra NSW, Australia

27th Aug 2019

Upgrade existing bathroom with new modern tiles and furnishings.

Tiling to Bathroom Renovation Batemans Bay

$5

Batemans Bay NSW, Australia

15th Feb 2020

I will do strip out (the unit is vacant). The layout will remain the same, but the shower bath to be replaced with just corner shower. Scope will include: - Just tiling or also - Build and fit out the room economically to suit being tenanted and low maintenance; - Re route vanity waste into wall for wall mounted vanity; - Install wall mounted stop ***** in vanity unit and laundry cabinet; - Terminate bath taps and install shower flip mixer. - Fit timber in wall to support towel rail; - Refix wall sheeting; - Waterproof floor and walls; - Floor tiling and full height wall tiles including tile the window reveal; - Replacement laundry cabinet with new flip mixer; - Replacement wall mounted vanity unit and flip mixer; - Fit accessories; - Fit new bathroom door; and - Install new shower screen. If you are interested, bid a dollar for the job, advise your experience and time line for completion of these works. I will accept your bid and then we can exchange contact details