I have a Growatt SPH 3600TL BL-UP hybrid inverter with a 3kWh battery installed on an exterior wall in Maidenhead (SL6). The EPS output port on the bottom of the inverter is currently unused/capped. Could you provide a quote to wire the EPS backup port to an essential-loads socket/sub-board with a changeover switch and dedicated copper earth rod so we have power during grid outages? Happy to send photos of the inverter and consumer unit.

Assignee
Paul J.'s profile image
5.0
(58)
100%
Completion rate

The percentage of the last 20 tasks successfully completed by the Tasker

Firstly thanks for posting your task and allowing me to quote. I am going off your description so if anything changes then please do let me know Hemel based Price is to supply and fit cut over manual switch and wire out EPS load to electrics. Test and manually failover. All parts are included in my costs I work this platform after 1800 Monday - Friday and from 0900-1800 at weekends. Date of booking may not be the date you specify on airtasker as I m normally booked a week in advance.. please check this if you proceed to book my service. Airtasker take 24% from the total of my quote so be mindful if you are trying to negotiate a cheaper cost as I have Tax, NI, travel and upkeep of tools to consider when pricing tasks. Any parts needed are not included in the above costs and will be charged at trade prices upon completion and you will be notified prior to any additional on the day.

Manish K.poster

Can you please confirm parts are included because in first paragraph says parts and included but last paragraph contradicts

It includes the parts