1.Gas plumbing: New fitting line from authority meter to cooktop and instantaneous hot water unit. 2.Water: New water lines from water meter to fixtures (hot and cold) & new PVC discharge pipes connecting fixtures to in-ground sewer drainage. 3.Fit-off: Fit off and commission appliances and fixtures. This is a 1956 Olympic house with concrete walls. Enough subfloor access and subfloor is fully cleaned. NO wall chasing is needed