Open

Assigned

Completed

Remove Existing Metal Door Frame & Infill Doorway

Posted by

Mary P.

Location

Potts Point NSW 2011, Australia

To be done on

Sun, 29 Nov

Remove Existing Metal Door Frame & Infill Doorway

$500

Details

I am looking for an experienced builder or carpenter with plastering experience to remove an existing metal door frame and permanently infill the doorway to create a seamless internal wall within my apartment. SCOPE OF WORKS 1. Removal of Existing Metal Door Frame Carefully remove the existing metal door frame in its entirety. The building was originally constructed as a hotel and is of solid construction. A grinder or other specialist tools may be required to remove the existing metal door frame. Minimise damage to the surrounding walls, ceilings, adjacent door frames and existing finishes. Make good any damage resulting from the removal of the existing metal door frame. 2. Timber Framing Cut away and remove the existing carpet and underlay within the doorway opening as required to facilitate the installation of the timber framing. Construct and install suitable timber stud framing within the existing doorway opening. Securely fix the timber framing to the existing structure using appropriate fixings. Ensure the framing accommodates the acoustic insulation and plasterboard thickness to achieve a flush finish with the existing adjoining walls on both sides. Timber for the stud framing has already been supplied by me. 3. Acoustic Insulation Supply and install suitable acoustic insulation within the timber-framed cavity to minimise sound transmission between the two rooms. Ensure the cavity is adequately insulated and any perimeter gaps are appropriately sealed to maximise acoustic performance. 4. Gyprock Plasterboard Installation & Finishing Supply and install standard Gyprock plasterboard to both sides of the newly framed doorway. Tape, set, joint and sand all plasterboard joints, fixings and perimeter junctions. Make good any damage or imperfections to the surrounding wall surfaces resulting from the works. Achieve a smooth, seamless and flush finish with the existing adjoining walls on both sides, ready for priming and painting. Painting is excluded from the scope of works. 5. Site Protection & Clean-up Adequately protect the existing surrounding walls, ceilings, adjacent door frames and finishes throughout the works. The existing carpet is being replaced with new flooring and therefore does not require protection. The contractor may cut away the existing carpet and underlay as required to complete the works. Minimise dust and disruption to the apartment and surrounding common areas. Remove all construction waste from the apartment, including the existing metal door frame, carpet offcuts, plasterboard offcuts and surplus materials. A commercial skip bin is available within the building. The contractor may utilise this bin at no additional cost, eliminating the need for off-site waste removal and disposal fees . Leave the work area clean and tidy upon completion. 6. Materials, Tools & Equipment Supplied by me: Timber for the stud framing. Access to the building's commercial skip bin. To be supplied by the contractor: Acoustic insulation. Gyprock plasterboard. All necessary fixings and fasteners. Plasterboard jointing compounds and tapes. Appropriate acoustic sealants. Protective coverings for surrounding walls and finishes. Any additional materials required to complete the works. All necessary tools and equipment. I am happy for the successful contractor to determine the most appropriate construction methodology, materials, fixings, tools and equipment based on their professional expertise and assessment of the existing site conditions, provided the finished result meets the requirements outlined above. 7. Required Timeframe Works are to commence as soon as possible, subject to the contractor's availability. All works must be fully completed no later than Thursday, 24 December 2026 (prior to Christmas Day). Please allow sufficient time for any required return visits, plasterboard jointing, drying and final sanding. Preference will be given to experienced contractors who can complete the works at the earliest possible date without compromising the quality of workmanship or finished result. 8. Additional Information Location: Kings Cross, NSW, 2011 The doorway to be removed and infilled is the middle open doorway shown in the first attached photograph. 9. Quotation Requirements Please provide an all-inclusive quotation covering labour, materials (excluding the timber already supplied), tools, equipment, site protection, clean-up and all visits required to achieve the specified finished result. Please exclude off-site waste removal and disposal fees for materials accepted in the building's commercial skip bin. When submitting your quotation, please confirm: Your relevant experience with similar works. Your earliest available commencement date. The anticipated duration of works. Your expected completion date. Any anticipated exclusions or additional requirements. High-quality workmanship and attention to detail are essential as I am a commercial interior designer and work with many builders on a regulate basis so continual work may be a result of this job.

0 new tasks
To see more tasks
or