I’m looking for an experienced tradesperson who regularly installs wooden flooring to lift and relay an area of no more than 6 square metres, in order to fix the current squeaky floor problem. Details for the work. To take up engineered floor in hallway and about one sq mtr into the bedroom on right hand side, take up the floorboards underneath engineered floor, level off the joists to create a flat surface, then fit the new engineered, supply and install 18mm plywood to make sure the subfloor is flat, then fit the new floor back down to join into old floor via floating method and supply fibreboard underlay to support the new floor.
Open
Assigned
Completed
Relay an area of less 6m2 to fix the current squeaky floor problem.
Task Budget
£200
More Options
Report this task
Relay an area of less 6m2 to fix the current squeaky floor problem.
£200
Details
0 new tasks