Hi Joe,
I can handle getting your 10x10 dock and aluminum ramp securely detached, rolled up the bank, and blocked up safely out of the winter flood zone before November 27th.
Because I am coming out from Eugene and a heavy riverfront extraction like this requires specialized commercial winching equipment to pull that kind of weight out of the mud safely, my flat rate for this project is $1,150.
This price covers:
• The 150-mile round-trip transit from Eugene to Scottsburg.
• Commercial rental rigging (high-capacity winches, heavy-duty tree-saver straps, and rolling tracks to protect your dock and bank from damage).
• Full insurance and liability coverage for your waterfront property during the extraction.
Hi Joe, I can handle getting your 10x10 dock and aluminum ramp securely detached, rolled up the bank, and blocked up safely out of the winter flood zone before November 27th. Because I am coming out from Eugene and a heavy riverfront extraction like this requires specialized commercial winching equipment to pull that kind of weight out of the mud safely, my flat rate for this project is $1,150. This price covers: • The 150-mile round-trip transit from Eugene to Scottsburg. • Commercial rental rigging (high-capacity winches, heavy-duty tree-saver straps, and rolling tracks to protect your dock and bank from damage). • Full insurance and liability coverage for your waterfront property during the extraction.