Reposition power cage and complete assembly of cable system (pulleys). I'm looking for help moving a power rack forward a few meters and setting up the rear cable system. • Phase 1 (Moving the structure): Help move the cage forward onto a carpet. The structure is already cleared of weight discs, but it would be ideal if you brought furniture sliders or some transport tool to move it easily without damaging the floor. • Phase 2 (M3 Cable Assembly/Adjustment): Check and complete the installation of the Mirafit M3 rear cable attachment with the low bar . The lower cable is not properly tensioned or is not properly routed through the lower pulleys and footplate . The routing needs to be checked following the instructions to make it operational. It's mainly done and the rack just needs moving but I don't have time to complete it. Happy to help with moving frame so only 1 person required.