Open

Assigned

Completed

Move power rack and finish attachment assembly

Posted by

Max E.

Location

Crow Wood, Cheshire

To be done on

Before Tomorrow

Move power rack and finish attachment assembly

£50

Details

Reposition power cage and complete assembly of cable system (pulleys). I'm looking for help moving a power rack forward a few meters and setting up the rear cable system. • Phase 1 (Moving the structure): Help move the cage forward onto a carpet. The structure is already cleared of weight discs, but it would be ideal if you brought furniture sliders or some transport tool to move it easily without damaging the floor. • Phase 2 (M3 Cable Assembly/Adjustment): Check and complete the installation of the Mirafit M3 rear cable attachment with the low bar . The lower cable is not properly tensioned or is not properly routed through the lower pulleys and footplate . The routing needs to be checked following the instructions to make it operational. It's mainly done and the rack just needs moving but I don't have time to complete it. Happy to help with moving frame so only 1 person required.

0 new tasks
To see more tasks
or