Open

Assigned

Completed

Move Hot Water Tank Off Controlled Load 2 to Main Switchboard (Solar

Posted by

M K.

Location

Macquarie Fields NSW 2564, Australia

To be done on

Flexible

Move Hot Water Tank Off Controlled Load 2 to Main Switchboard (Solar

$300

Details

I am looking for a licensed NSW electrician to rewire my existing electric storage hot water tank from Controlled Load 2 (Off-Peak) onto my main household switchboard, so it runs off my solar panels and home battery instead of importing from the grid. Current Setup: Electric storage hot water tank currently wired to Controlled Load 2 in the meter box (using ~184 kWh/month, or ~6.1 kWh/day). The home has a 2-phase supply with an 11.35 kW solar system and a 28 kWh Fox ESS battery (connected to a single-phase Fox ESS hybrid inverter on Phase 1). Total household usage including hot water is only ~14 kWh/day. Scope of Work: Disconnect the hot water circuit from the Controlled Load 2 relay/meter channel in the meter box. Reconnect the hot water circuit onto the main household switchboard downstream of the Fox ESS smart meter, specifically on the same active phase as the Fox ESS battery inverter (subject to standard phase load check). (Optional – please quote separately if possible) Install a DIN-rail timer on the hot water circuit set to heat during peak solar hours (10:00 am – 3:00 pm). Provide a Certificate of Compliance for Electrical Work (CCEW) so I can notify my electricity retailer (AGL) to close the Controlled Load 2 tariff. Access & Photos: Easy ground-level access to the meter box and main switchboard. I can send clear photos of the open meter box, switchboard, and inverter labels upon request so you can quote accurately. Please include your NSW electrical licence number and availability in your quote. Thanks!

0 new tasks
To see more tasks
or