With metal frames, Looking for an experienced carpenter for a new double-storey home in Oran Park. LED channels installation. Work required with metal frames build: 1. Install timber supports/backing for recessed LED channels. 2. Install the supplied aluminium LED channels and diffusers. 3. Ensure everything is properly aligned and positioned before gyprock installation. Also install speaker backings/blocking for in-ceiling speakers. Also raise a step-up in the theatre room up (4m × 1.3m × 200mm height) Please contact me with your experience, availability and quote.
Open
Assigned
Completed
Looking for an experienced carpenter for LED channel installation.
Task Budget
$1,000
More Options
Report this task
Looking for an experienced carpenter for LED channel installation.
$1,000
Details
0 new tasks