Outdoor Kitchen Plumbing. 1. GAS Connection - this is currently at the Back Door. It needs to be run to the new BBQ positioning - about 6-7 metres. The plumbing will run through a NEW Half-Height wall that is about to be built and then under a new Floor section across to the BBQ. 2. Water/ plumbing - currently, this is on a slab - This needs to be moved about 1 - 1.5metres across - it will run UNDERNEATH a New Raised floor- which will have a 150mm height only. 3. Connect SINK UP - 4. GAS Connect to new BBQ. Everything must be working.