We have a 5 x 5.5 area that needs levelled, weed mat laid, sand and concrete pavers laid down. This is a temporary patio to do a year or so.
Open
Assigned
Completed
Report this task
Lay concrete pavers
Details
We have a 5 x 5.5 area that needs levelled, weed mat laid, sand and concrete pavers laid down. This is a temporary patio to do a year or so.