Around 4 cubic meter of dirt need to be moved on the other side of the slab through a wheel barrow. The total distance s around 10 meter where the dirt needs to be dropped Around 5 hours of manual Labour are considered for this task. If you have to spend more than 5 hours, the task price will be increased
Open
Assigned
Completed
Labour with a wheel barrow
Task Budget
$250
More Options
Report this task
Details
0 new tasks
Availability: Today I can be available anytime to complete this task with my own tools. I work actively in earthworks and have lots of experience in new builds including soil spread, slab falls, site cleans and maintaining ground levels throughout each stage of building