I have a sliding gate that has been constructed I have the guidepost already installed I require the gate and the rails etc to be installed I have all hardware I will remove all vegetation and existing Gates note that the plymph for the sliding gate to return to is slightly shallower in depth than the concrete where the gate will sit when the gate is closed I've purchased some steel and had holes prepared for dyna bolts to enable the whole surface of approximately 6 meters to be level