Inspect existing ground levels before quoting. Prepare and level the ground in front of the granny flat, supply and install pavers and a drainage grate/grid. Ensure the correct finished levels and gradient are established so surface water drains towards the grate and away from the granny flat, preventing water pooling or entering the building. Complete all works with a neat finish.