Please refer to the attached images. We recently demolished and renovated our kitchen. In hindsight, we should have levelled and re-laid the flooring before the new kitchen was installed, but work is now done. The images show rough concrete where the old cabinetry stood and where we removed part of the wall between the kitchen and sunroom. Our requirements: Options for levelling the floor where the old cabinetry stood, so we can relay matching flooring. The area where the dishwasher will go needs to be levelled with the rest of the floor, so the dishwasher can slide in and out easily without a lip. Please include in the quote an option to relay the flooring throughout, as we can source the exact flooring. We have also received a quote from the Revesby Flooring company that originally laid our flooring, but they need to the floor to be completely level before they can relay it. We are also seeking expert recommendations.