Looking to secure and repair a total of 3 flexing/uneven timber floorboards (1 main board with a split, plus 2 adjacent boards that also flex when stepped on). Key Details: Issue: 3 adjacent floorboards flex vertically when stepped on, causing a split along one of the main joints. Needs subfloor support fixed (blocking, wedging, or sistering across the joists underneath) to eliminate all movement across all 3 boards, then the top split cleaned, filled, and blended to match. Access: Subfloor access is readily available. Location: Reservoir East (House). Timing: Flexible start date. open to reasonable quotes