Looking for an experienced concreter to fill and finish an excavated area beside my swimming pool in Brighton. The job involves: * Remove any loose rocks and debris. * Protect the existing pool pipes and skimmer box with sand or suitable bedding material. * Backfill the hole with compacted crushed rock or road base. * Finish with a relatively thin concrete layer (approximately 75–100 mm, subject to suitability), level with the surrounding paving. * Include an isolation joint to separate the new concrete from the existing paving. * Keep the skimmer lid and plumbing access points accessible. * Match the existing concrete finish as closely as possible. * All materials, labour and cleanup to be included.