side passage between a boundary wall and a raised pool wall. Gate access 1100 millimetres (suits mini excavator or Dingo). SCOPE Remove artificial turf and the timber frame underneath. Gas line trench: follow the trench already started, dig to 250 millimetres deep. Do not disturb or move the gas pipe (licensed gas fitter will relocate it). Path (about 24 square metres including turf area), excavated to level, not a set depth: Along pool wall: 75 millimetres below top of the concrete lip (about 100 millimetres below finished tile level), following the lip where it steps Turf area by pool coping: 100 millimetres below finished tile level Ramp (3 by 1.5 metres): 50 millimetres deep Remove and legally dispose of all turf, timber, gravel, soil, Tip receipt required. QUANTITIES 28.5 square metres. Allow up to 4 cubic metres loose spoil (includes 25 per cent swell), plus turf and frame. CONDITIONS Concrete lip is the pool wall footing: do not undermine or damage Hand dig only near gas line and pool plumbing Fixed price. Please state equipment and disposal method in your offer.