Open

Assigned

Completed

Commercial hoarding on unit in Canary Wharf (between 00:00-07:00)

Posted by

James P.

Location

Canary Wharf, Greater London

To be done on

On Mon, 16 NovAnytime

Commercial hoarding on unit in Canary Wharf (between 00:00-07:00)

£5,000

Details

HOARDING SPECIFICATION The work must be carried out and installed at the front of the unit between midnight and 7 am. Sufficient RAMS/Insurances will be required by Canary Wharf in advance. • Because the hoarding is to be installed within a Canary Wharf mall, a high standard of finish and installation is expected. • The boarding shall be 15mm MDF biscuit-jointed boarding fixed & glued on generally 75x50mm framework • The hoarding should be prefabricated and spray-painted off site • Paint colour is RAL 9010 vinyl silk. • Flush doors only opening inwards, single or double as necessary, with digi-lock furniture only. • Pre-spayed 100x15mm skirting and head rail glued on site. • Wheels incorporated if the hoarding needs to be pulled out to allow more work room – (e.g. mall situation where the hoarding cannot extend out too far during operating hours) Size: 9.5m x 4m

0 new tasks
To see more tasks
or