Install a back-to-wall toilet with concealed cistern and WC unit. Install a wall-hung vanity unit with sink, including plumbing connections. Install an LED bathroom mirror (electrical point already in place). Carry out boxing-in around pipework and walls where required. Complete necessary tiling and finishing work. The old bathroom units have already been removed. All materials will be provided.
0 new tasks