The front steps have dropped marginally, and the metal frame has shifted away from one part of the brickwork. The frame requires 3 bolts ground off, and the frame lifted 30 mm approx and rebolted to existing concrete steps, and one bolt back to existing brick work. Also, a timber edge needs to be installed where marked ‘yellow’ on the photo’s to hide the marks on the brickwork, where the steps have dropped.