This double socket needs moving around 20cm to the right and wall plastered/made tidy after move. Needs to be done before the 30th as having new kitchen cabs
Open
Assigned
Completed
Report this task
Move kitchen socket
Details
This double socket needs moving around 20cm to the right and wall plastered/made tidy after move. Needs to be done before the 30th as having new kitchen cabs