1- Relocate one internal wall (between meals and dining area in attached plan) with the cavity sliding door already in that wall. Wall is 2.7m wide and 2.4 m tall. Cavity sliding door is 0. 9m wide. I'm almost sure the wall is not load bearing as I have inspected the roof frame and top member of the wall. There is 30mm gap between them. See attached picture. Wall crossed in red is removed and then built where shown in purple. 2- Remove 0.9 m wall on the side of kitchen and build 1.5 meter wall as an extension to it. See the purple line in attached plan. Note that there is electric switches on this wall. 3- remove 0.2 meter wall in the corner of meals area and then add a 0.9 m wide cavity sliding door into the wall on the left side of meals area. There is electric switch on this wall. 4- Make all walls ready for painting. 5- Double check that walls are not load bearing. I have attached pictures of the top of the walls in roof cavity. 6- Remove all the waste and deliver the project ready for painting. Note that there is switches on these walls so a sparky will join the team to fit the switches.