The idea is to carefully remove all the existing bathroom fittings and materials, such as the bath, toilet, washbasin and other items, without damaging them. Once removed, I would like everything to be carefully transported downstairs and stored in the garden, in the designated area where we keep the recycling bins. Once the bathroom has been completely cleared, I would like you to convert the entire space into a box room. I will provide all the necessary materials. I would just like you to give me an estimate for: 1. The total labour cost for the complete job. 2. How many days you estimate it will take to complete. My intention is to completely transform the existing bathroom into a normal, usable room (box room), rather than simply removing the bathroom fixtures. I would like all existing bathroom fittings, including the bathtub, toilet, washbasin, taps and other removable items, to be dismantled and removed carefully. Regarding the walls and floor: * Any existing tiles, panels or unsuitable wall coverings should be removed. * The walls should be repaired and covered with new suitable material, leaving a smooth, clean finish. * The existing bathroom flooring should be removed or covered with suitable new flooring. * All holes, marks and exposed pipes should be properly sealed, concealed or removed where appropriate. * Any redundant plumbing and drainage connections must be safely disconnected, capped and concealed. * The ceiling, walls and floor should be finished properly so that the space looks like an ordinary room, with no visible bathroom fittings, exposed pipes or unfinished areas. Essentially, I want the room to be left clean, safe and fully finished, ready to be used as a normal box room.
Hi, I can carefully remove the existing bathroom fittings, including the bath, toilet, washbasin and other removable items, making sure they are kept intact wherever possible. I will carefully transport everything downstairs and place it in the designated storage area in the garden, as requested. My labour price for this work would be £500 includes the platform fee 24% Once the bathroom has been cleared, we can discuss the next stage of converting the space into a box room and agree on a separate price. Thank you.