Eric B. (job poster) hired Teresa H. (Tasker) to help with this task. Got a similar task you need done?
Open
Assigned
Completed

Sell my treadmill + work desk.

Posted by Eric B.

Location

Darlinghurst, NSW

View map
Due date
Friday, 6th Apr 2012
Details
I have to move in a hurry and two large bulky items are getting in the way of doing this. A Treadmill and a glass desk. The treadmill is quite small relative to your typical gym treadmill but quite heavy (75kg iirc), the desk is a glass desk with a steel frame approx 2.4m wide by 1-1.5m deep.

I will pay you a cash up front commission to sell these items and you can keep a 40% commission of whatever you sell them for in addition to this.

They both work and are in good condition. To transport them away from their current location you will need suitable transport. There is a loading dock out back. A flat bed truck would likely suffice, a moving van would definitely suffice, I can take exact measurements of the items in question to your directions.
Reviews
Eric B. left a review for Teresa H.
“Teresa accomplished the task well and highly recommend.”
Assignee
Teresa H.
(1)
100%Completion rate

The percentage of accepted tasks this Tasker has completed.

Task Activity
16 comments about this Task
Comments are now closed
Eric B.poster
Brand and Model Name is Active Fitness Ti-3000i
Eric B.poster
Specification :
Speed : 22 km\h
Horse Power : 6.5 HP (Peak)
Incline : 20 levels
Program : 112
HRC : Yes
Belt Width : 450mm
Maximum User Weight : 220 kg
Assembly Size : 171 x 76 x 135cm (L x W x H)
Package Size : 178 x 77 x 33cm (L x W x H)
Gross Weight : 78 kg
Warranty : Lifetime motor & frame, 12 months parts replacement
Eric B.poster
Ahh, This I can help you out with;
Thanks Teresa.... I just spoke to the interested buyer and he is keen to also know the model so he can check out if its the kind he's after.. I'm sure Eric being a technical software guy would have bought something savvy... :)
Eric B.poster
That's correct I did, my mistake, mixed up the wall and the PM system. Tsk tsk, what kind of software developer am I that I couldn't tell the difference.
Task Assigned
0 new tasks