Hamed F. (job poster) hired Matt J. (Tasker) to help with this task. Got a similar task you need done?
Open
Assigned
Completed

Excavate and Level land, remove soil

Posted by Hamed F.

Location

North Wahroonga NSW 2076, Australia

View map
Due date
Wednesday, 16th Aug 2017
Details
I have a 2.5M x 10M old lawn bed that has about one cubic meter extra sandy soil. I need someone to excavate and level the land also take away the excavated soil.
See attached the photo of the site.
Reviews
Hamed F. left a review for Matt J.
“Excellent work! Good communication, fair pricing. Thanks a lot Matt!”
Matt J. left a review for Hamed F.
“Hamed was a pleasure to work for direct and precise with instructions thank you happy to help anytime”
Assignee
Matt J.
(5)
71%Completion rate

The percentage of accepted tasks this Tasker has completed.

Have excavator and tipper happy to help can discuss cost of soil disposal onsite as price vary depending on volume and condition.My fee includes float of machine to site. Thanks
Hamed F.poster
Hi Matt, thanks for your offer, I need to have an idea about the disposal cost. It would be great if you can give me a quote for one cubic meter soil.
Thanks
On the measurements you posted with the depth taken out over the whole area maybe around 4- 8 cubic meters and it cost from $246 - $375 per ton 1 cub of soil is around 1.2ton so that is a guide hope it helps or if you have someone willing to take.
Hamed F.poster
Thanks Matt, I think if we remove 1 cubic meter and level out the rest it should be fine. I guess I exaggerated a bit in measurements.
I will accept your offer for the main job of excavation and levelling and will discuss the disposal on site or I will find another solution for that. Will you be available tomorrow? I prefer Wednesdays and Saturdays.
Questions(4)
Hi hamed could you assign so I can do task tomorrow would like to be there first up in the morning
Just assign then. We can exchange details thanks
Hi hamed Ian available for tomorrow can start you a first job and happy discuss disposal
Hi hamed how deep do you have to go..
Hamed F.poster
Hi Michael, half of the area is almost level maybe 2cm deep...the other half is a bit bumpy and requires more excavation...I think about 10-15cm deep.
Thanks